
|
Design / Build HVAC consisting of 360-tons of mechanical cooling with 138 zones of VAV reheat with Direct Digital ControlsProject included the design and installation of the mechanical systems for many specialized areas such as:
Design and install mission critical cooling chillers and 24-7 mechanical cooling and support systems for:
Design and install specialized high-purity airflow with HEPA bag-in / bag-out exhaust systems for:
Design and Installation of Medical Gas and alarm system. |
| General Contractor: McCarthy Construction |
| Architect: Arch Images |
| Control Contractor: Automation Solutions Group – American Automatrix DDC Controls |

